02-17/2025
The 8 steps for applying striping paint:
1. Planning and design,
2. Material and equipment preparation,
3. Cleaning and preparing the construction surface,
4. Laying out lines and marking,
5. Applying striping paint,
6. Drying and curing,
7. Cleaning and inspection,
8. Opening traffic.