COMPOSITION
Epoxy asphalt coating is formed by epoxy, coal tar pitch, pigments, additives, and organic solvent with mixed amine as the curing agent. When used in accordance with the provisions and mixing ratio, fully stir well within the prescribed time after preparation.
FEATURE:
After drying, the asphalt epoxy anti corrosive paint has strong adhesion, water and moisture resistance, and excellent corrosion resistance, withstanding the corrosion of chemical media. After coating, it should be put into water, buried in the ground, or protected from sun exposure as soon as possible to prevent the coating from pulverizing and cracking.
USES:
The epoxy asphalt paint is suitable for long-term protective topcoat for steel structures and concrete structures underwater, underground, and in heavily corroded environments not exposed to sunlight, such as oil, water, and gas pipelines, etc. It is also used for surface coating of metal components of industrial equipment in chemical plants and sewage treatment plants.
H06-15 EPOXY ASPHALT ANTI-CORROSION PAINT Tethnical Parameter
ITEM | NORM | |
Packaging specification | Paint: 18KG | Curing agent: 2KG |
Appearance | Liquid | |
Film color and appearance | Black brown | |
Dry time,h,(25℃) | Surface dry h≤4 | |
Hard dry h≤24 | ||
Adhesive force,grade≤ | 1 | |
Flexible,mm≤ | 1 | |
Impact force,kg.c㎡ | 50 | |
Salt fog resistance test,300h | No change | |
Salt water resistance test (soak In 3% NaCl salt water for 96h) | No change | |
Acid resistance (soak in 3% H₂SO₄ liquid for 48h) | No change | |
Alkali resistance (soak in 5% NaOH liquid for 48h) | No change |
Physical Parameters and Construct Specifications for Reference
Mixing ratio | Paint : curing agent=9:1 |
Life time after mix | 3h |
Density after mix | About 1.5kg/L |
Flashing point | ≤60° |
Each film thickness | Dry film 40um,wet film 60um |
Theoretical coverage | 0.2kg/m |
Advise coating layer | 2 Coats |
Re-coat interval | 4h ,exceed 7days should be processed by polishing |
Surface treatment | The surface of the base must be clean and dry , without loose paint, grease and other dirt , sandblasting or grinding to Sa2 grade. |
Construction environment | Construction temperature is 5~40 ℃ Air relative humidity less than 85% . The substrate surface humidity is 3℃ higher than the dew point Avoid construction in the rain, snow, fog weather. |
Coating method | Brush,Spray, Roller coating |
Storage life | 1.5 Year |
Certificate
Guangdong Huaren Chemical industry Co., Ltd. products has passed ROHS certificate, ensure the products pass Europe standard ; has passed ISO9001:2015 certificate, ensure supply stable quality to our suppliers.
Service Advantages
Customization
Customized various performance coatings,according to the use situation,Design appropriate process and coating application plan.
Large-scale production capacity
The annual output of 30000 tons of coating and 20000 tons of resin has a large production baseof 20000 square meters.
Construction and technical services
Professional construction team, providing design, construction and technical guidance.
Timely delivery service
The subsidiary dangerous goods transportation company owned by the group can efficiently deliver materials for large-scale and key projects on time.